• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Bitterroot Star

Bitterroot Valley's best source for local news!

  • Home
  • News
  • Sports
  • Opinion
  • Classifieds
    • Buildings
    • Farm & Garden
    • For Rent
    • For Sale
    • Free
    • Help Wanted
    • Real Estate
    • Sales/Auctions
    • Services
  • Legal Notices
  • Obituaries
  • Calendar
  • Services
    • Letter to the Editor
    • Place Classified Ad
    • Submit a Press Release
    • Contact Us
    • About Us
  • Subscribe

USCM hypocrisy at Sheep Creek 

August 28, 2026 by Guest Post Leave a Comment

by Bob Williams, Stevensville 

USCM promised transparency, but USCM revised Plan of Operation PoO fails to disclose increasing width & height of narrow old Adit 1 tunnel.

   In the first 250’ of Adit 1, USCM would slant drill maybe 800 holes. Then detonate maybe 800 pounds of RDX & ANFO, (300 cubic yards X 2.75 # ANFO/RDX per cubic yard). To blast out maybe 300 cubic solid yards of augen gneiss, with chunks and blocks of hornblende amphibolite. If USCM enlarges Adit 1 from a 5’X7’, to a 7’X9’ 6”, tunnel. 

   No categorical exclusion for the PoO, as some blasted tunnel rock will contain arsenic. Or lead. Or asbestiform. Or radionuclides.

   No one would allow USCM to outside the tunnel mouth, pile up blasted out tunnel rock pieces with air spaces, in what might be, at 40% swell, a pile of 420 cubic yards. And 770 tons weight. 

    USCM has painted themselves into a corner, where a utility helicopter flies everything to the staging area. Now USCM would have to fly out what they take out! Enlarging 300’ Adit 1 tunnel so machines can extract 3,000 tons of carbonatite ore from one location, in one dike filled from deep massive molten carbonatite.

  Now they’d need 21, 20 ton dump trucks to haul blasted out tunnel rock away from the staging area. Haul some to a facility charging plenty, for perpetual responsibility for radionuclides. Haul some to another facility, charging big to perpetually hold, blasted out rock containing arsenic or lead, or hard fiber asbestiform rock.

    USCM knows MT DEQ and MSHA(Mine Safety and Health Administration), may want the tunnel roof to be made safe by driving upwards 5’ long bolts.  Bolting to them, thick wire mesh across the ceiling. MSHA may want an escapeway at tunnel end.

   USCM might drop 180 days of block sample mining, and push for the other part of their revised PoO, to on the surface, in 90 days, from 45 drilled holes, obtain 18,000’ of 3 ¾” diameter core samples.

   Then show core laboratory assays to a gov backed entity, that could slowly develop large scale processing. And large scale mining of carbonatite ore. From 60 dikes in the USCM claim block, of eleven square miles.

Filed Under: Opinion

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Search This Website

Discover the Bitterroot 2026

Search this website…

Local Info

  • Bitterroot Chamber of Commerce
  • Ravalli County
  • Ravalli County Economic Development Authority
  • City of Hamilton
  • Town of Stevensville
  • Town of Darby
  • Bitterroot Public Library
  • North Valley Public Library
  • Stevensville Community Foundation
  • Ravalli County Council on Aging
  • Bitterroot Producers Directory
  • Ravalli County Schools
  • Real Estate
  • Montana Works

Like us

Read our e-edition!

Montana Info

  • Montana Ski Report
  • Montana Fish, Wildlife, & Parks
  • National Parks in Montana
  • Montana Wildfires – INCIWEB
  • US Forest Service – Missoula
  • Firewise USA
  • Recreation.gov

Check Road Conditions

Road Conditions

Footer

Services

  • Place Classified Ad
  • Submit a Press Release
  • Letter to the Editor
  • Submit an Event
  • Subscribe
  • About Us
  • Contact Us

Our location:

PO Box 133

115 W. 3rd Street
Stevensville, MT  59870
Phone: (406) 777-3928
Fax: (406) 777-4265

Archives – May 2011 to Present

Archives Prior to May 2011

Click here for archives prior to May 2011.

The Bitterroot Star Newspaper Co: ISSN 1050-8724 (Print) ISSN 2994-0273 (Online)
Copyright © 2026 · Bitterroot Star · Maintenance · Site by Linda Lancaster at Bitterroot Web Designs